# Actions Proyek ID RAB Nama RAB Total Jumlah Keterangan
1 Arraya 3 E MANAJEMEN PENGAWASAN PUSAT 239,538,000.00 -
2 Arraya 3 F BIAYA PERLENGKAPAN KANTOR 27,000,000.00 -
3 Arraya 3 G OVERHEAD KANTOR - -
4 Arraya 3 G1 Operasional Kantor 783,500,000.00 -
5 Arraya 3 G2 Operasional Proyek 73,100,000.00 -
6 Arraya 3 G3 Operasional Pemasaran 1,135,030,000.00 -
SUM = 2,258,168,000.00